FANUC 31i-B R954: Why RD can be lit without CC-Link I/O
RD only shows carrier detection. Read RUN, SD and ERR together, then check whether the master is exchanging data with this station.
Contents
R954 makes the CNC a remote device station
The 2017 FANUC catalog lists classic CC-Link remote device station function A02B-0327-R954 for the non-Plus 31i-B. A02B-0323-J320 is the catalog ordering specification for the board, not the PCB assembly number. The catalog says this CC-Link function cannot be used with DeviceNet or PROFIBUS-DP functions at the same time. Do not extend that statement to other series or to CC-Link IE Field. (FANUC catalog, printed p. 588 / PDF p. 589)
Separate the board from option entitlement
B-64482EN/03 describes the CNC as a remote device station that communicates with a master and requires the optional board. Carrier detection does not show that the master is exchanging cyclic data with the CNC, or that the PLC’s I/O mapping is correct. (FANUC Descriptions, §15.3, p. 377)
Read the full LED pattern
B-64485EN/01 identifies the remote station board as A20B-8101-0551. ERR refers to the board’s ERROR indicator. In RUN/SD/RD/ERR order, normal is on/blinking/on/off; SD can look continuously lit on small networks. On/off/on/off means the CNC is not receiving data addressed to it from the master: check master station settings first. Off/blinking/on/off means the master link has not started. Blinking ERR means a CRC error: review the connection, termination, noise and baud rate rather than assuming the board failed. (FANUC Maintenance Manual, §2.6.6, pp. 239–240)
Read-only checks and authorized commissioning
Where the Mitsubishi guide applies to the installed master module, check the station bit in SW0080–SW0083 read-only to corroborate link status. These are not FANUC diagnostic numbers. No dedicated absent-R954 CNC alarm was verified; do not borrow I/O Link or IE Field alarms. No common minimum CNC software revision was verified. Give FANUC or the builder the CNC model and software revision, board number, master configuration record and LED pattern. Have them verify the option and commission it under the machine’s approved procedure. Do not change PLC mapping or force I/O as a diagnostic test. (Mitsubishi CC-Link troubleshooting guide, §2.3 and Appendix 2)